ElectricalReady to Hire
Electrical
Posted June 22, 2016
Project Description
1. AC unit outdoor needs a Disconnect Switch 2. Powder room needs a GFI electric outlet installed (no electric outlet at present). Note: Need a licensed and insured electrician. Needs to get the work done as soon as possible (before June 28th).
Project Details
- Budget
- up to $500
- Timeline
- Less than 2 months
- Start Date
- Now
- Location
- Brookhaven, Pennsylvania 19015
- Address
- 1005 Mulberry St, Brookhaven
- Property Owned
- Yes
- Currently in Renovation
- Yes