HandymanPlanning and Budgeting

Handyman

Posted September 29, 2015

Project Description

I have at least 7 projects ,I can only afford one project at a time unless total price is really low ,following are the projects in order of importance ,I can get materials or the contractor can do which ever is more economical for me. 1)- room 1 (kitchen) some floor replacement in kitchen ,cabinet moved in kitchen & install linoleum. 2)- room 2 (bedroom) drywall on ceiling (frame already in place) some drywall on walls. 3)- living room (front room) repair drywall ceiling ,check and/or replace floor 4)- storage room repair ceiling 5)- check/upgrade electrical wiring/plugs/sockets 6)- outside (front) wooden hand railing needed on porch 7)- outside (front, back, side) replacement windows

Project Details

Budget
up to $500
Timeline
Timing is Flexible
Start Date
2-Weeks
Location
Louisville, Kentucky 40212
Address
2204 Duncan street
Property Owned
No
Currently in Renovation
No

Homeowner

a

anthony crockett

Member since September 29, 2015

Contact Homeowner
Back to all projects