Garages and OutbuildingsPlanning and Budgeting
Garages and Outbuildings
Posted September 5, 2015
Project Description
Driveway is about 600 sq. ft. 6 separate slabs separated by wood. 4 long cracks and some slab surfaces are uneven. Typical,concrete material used. Need to repair only.
Project Details
- Budget
- up to $500
- Timeline
- Timing is Flexible
- Start Date
- Now
- Location
- Everett, Washington 98203
- Address
- 5931 25th Ave W
- Property Owned
- No
- Currently in Renovation
- Yes