Drywall and PlasteringReady to Hire
Drywall and Plastering
Posted May 18, 2015
Project Description
4 things need to be done. 1. Ceiling drywall came off because of a upstairs toilet leak. Needs to be patched up and painted. 2. Toilet clog 3. one of the faucets in a bathroom drips/leaks. 4. Front door needs to be made more robust and maybe change the lock.
Project Details
- Budget
- up to $500
- Timeline
- Less than 2 months
- Start Date
- Now
- Location
- Santa Clara, California 95051
- Address
- 2870 Forbes Ave, Santa Clara
- Property Owned
- Yes
- Currently in Renovation
- No