ConcreteReady to Hire
Concrete
Posted October 10, 2024
Project Description
I need concrete poured for a greenhouse foundation in my driveway. The soil foundation is 8 by 14 feet, and I want the concrete poured to be 9 by 15 feet.
Project Details
- Budget
- $1000 to $2500
- Timeline
- Less than 2 months
- Start Date
- 1-Week
- Location
- Dallas, Texas 75208
- Address
- 808 brooks ave
- Property Owned
- No
- Currently in Renovation
- No