ConcreteReady to Hire
Concrete
Posted September 29, 2023
Project Description
15 feet x 24" of backyard concrete sidewalk needs to be replaced.
Project Details
- Budget
- $500 to $1000
- Timeline
- Less than 2 months
- Start Date
- 2-Weeks
- Location
- Hesperia, California 91790
- Address
- 17530 Adobe St.
- Property Owned
- No
- Currently in Renovation
- No