FlooringReady to Hire
Flooring
Posted March 19, 2023
Project Description
Replacing damaged laminate floor and base boards in condo kitchen and laundry room (includes removal and reconnection of: vertical washer/dryer, water heater, refrigerator, and stove). Moisture testing of insulation in ceiling and drywall repairs are also needed.
Project Details
- Budget
- $1000 to $2500
- Timeline
- Less than 2 months
- Start Date
- Now
- Location
- Orlando, Florida 32819
- Address
- 7511 Seurat St, apt. 10208
- Property Owned
- No
- Currently in Renovation
- No