Project Description
We have some outdoor framing that needs done. We need the sheet metal peeled back, and a layer of plywood. There is some electrical boxes that may be in the way, mounted on the outside of the sheetmetal. There is some blocking that needs to be added between studs to strengthen the wall. We will have it inspected by 3rd party. Then the plywood, and sheet metal need to be put back on. I don not know if new sheet metal, or plywood will be need to replace what is removed. If so it will be supplied by the contractor. There are two areas on the same parapet wall that need this. This parapet wall is on the penthouse of the roof.
Project Details
- Budget
- $10000 to $25000
- Timeline
- Less than 2 months
- Start Date
- 1-2 Months
- Location
- Portland, Oregon 97209
- Address
- 16785 NE Mason St, Suite B
- Property Owned
- No
- Currently in Renovation
- No